The Three-Year Plan Discussed Below is
Optional Available Only Upon Request Note: The Gymnasium
Owner/Supervisor should insure that chairs, tables and other sports
equipment such as, movable bleachers, volleyball equipment, including
standards, etc., are taken off the floor and stored in a temporary place
while this Routine Annual Maintenance is being performed. The Process: 1) The floor is cleaned prior to the beginning of any work. 2) Prior to and even during the Buff-Sanding Process, tar, gum and other debris are being
removed from the floor. In some instances. Removal of these foreign materials
may require scraping or adding mild chemicals to assist with
the softening process and the correct extraction of these unwanted
surface materials without damaging the floor. 3) The floor is then Buff-Sanded, using the most
appropriate Steel Screens
Sanding-Discs. The discs are usually 60/100/150/or, in some instances,
other steel grit screens However, we do use the application necessary to
complete the job correctly.. 4) Following the complete Disc-Sanding of the Gymnasium Floor,
liquid chemicals are applied to the entire floor surface. It is at this point
that body fluids and other unwanted surface bacteria are being removed.
Afterwards, the floor will, again, be thoroughly clean and dry before
the application of the High Grade Polyurethane finish and final
coat. 5) When the floor is dry, the FIRST COAT of (High Grade) POLYURETHANE is
then evenly applied over the entire Gymnasium Floor. This application is
undertaken, using "Gravity Flow Containers with Lambs
Wool-Like Applicators." This allows the Polyurethane liquid to be
applied monolithically and without separations and irregular-markings. The
coverage is 100 percent. 6) Usually after one day, the SECOND COAT of (High Grade) POLYURETHANE
is applied evenly on top of the already surface-dried first coat. The
application of this second coat is the same as the first coat of
Polyurethane. 7) This is the final process for the Annual Maintenance Program.
However, it is important that no one walks on the floor for a minimum of 48
hours. This allows the curing process to harden the surface of the
Polyurethane. 8) For some on-floor requirements, such as Indoor Hockey,
Kids Mobile Cars, Roller Skating, and other very rigorous uses, it
would be best to wait for one week to ten days before undertaking these
activities. |
|
||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
||
|
|
|
|
|
|
|
Additional Services During the Annual Maintenance Process: a) Repairs can be made at this time. b) Additional Gamelines (or repainting of old gamelines) should be
done during this process. c) Logos, lettering and or other changes to the lines or layout
configuration can take place during this work. d) Keep in mind, gamelines that are already in place cannot be
removed. They can only be modified by adding other lines, or configurations
you may wish to apply. Changing the gameline layouts, that is removing lines,
logos or lettering can only take place during the complete drum-sanding of the
floor. This is outlined on another Bulletin:
SportsGuard Sanding and Finishing
Gymnasium Floors Note: Those who do allow
the above process on an annual basis have floors that look very new and
sanitary. Also, they are more serviceable for a longer period of time. The
foot traction, for sports games and or walking, with the newly
applied Polyurethane is excellent, and the need to sand and completely
finish the gym floor can usually be postponed considerably. There are other ways to help maintain the gym floor through the
year. 1) Read about this in the Daily
Maintenance Guide. We discuss in detail, ways to maintain your floor on
an ongoing basis. Refer here to our Web site: www.GymnasiumDesigns.com 2) Consider the purchase of a Gymnasium Floor Cover with the Floor Cover
Storage Rack. This helps the floor with regard to
Street-Shoe Traffic while the floor is not being used for basketball and
other sports. Special Notation: We have a number of other products listed on our Web site, i.e.,
Curtain Dividers, Wall and Beam Padding, and others. You may wish to view
these other products at your convenience. |
||||